Opportunities Archive
NEWSLETTERS
- DBE Connection - October 2018
- DBE Connection - August 2018
- DBE Connection - July 2018
- DBE Connection - June 2018
- DBE Connection - May 2018
- DBE Connection - April 2018
- DBE Connection - March 2018
- DBE Connection - January 2018
- DBE Connection - December 2017
- DBE Connection - November 2017
- DBE Connection - October 2017
- DBE Connection - September 2017
- DBE Connection - August 2017
- DBE Connection - July 2017
- DBE Connection - June 2017
- DBE Connection - May 2017
- DBE Connection - April 2017
- DBE Connection - March 2017
- DBE Connection - February 2017
- DBE Connection - January 2017
- Mid-Coast Corridor Transit Project - April 2015
DOWNLOADS
- Subcontractor Registration Card
- CUF Training Workshop Presentation 11/29/16
- Nobel Parking Structure Site Plan May 2016
- Caltrans SB Council Meeting Aug 2016 PPT
- Caltrans SB/DVBE Cert. Workshop 9/13/16
- Free Estimating Workshop 9/28/16
- Upcoming Subcontractor Opportunities
CALENDAR OF EVENTS
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- November 2016
- October 2016
- September 2016
Past EVENTS
SUMMER 2017
SANDAG and MCTC are finalizing the requirements to release the following scopes of work for bids in June and July of 2017:
Elevator Tower Glass
Section 108 44 26.19
Point-Supported Structural Glass Curtain Walls
Summary
A. Description: This Section includes the requirements for furnishing and installing point supported structural glass curtain walls.
B. Section Includes:
1. Suspended, frameless, tempered laminated glass curtain walls and canopies on steel framing at elevator hoist way.
2. Glass, anchors, fittings, and accessories.
3. Perimeter sealant.
4. Anti-graffiti film.
Station Elevators
Section 114 22 00
Station Patron Elevators
1.01 Summary
A. Description: This Section includes requirements for furnishing and installing passenger elevators in stations.
Station Steel Towers
Section 55-4 Station Structural Steel
55-4.01 Structural Steel Framing
55-4.01A (1) Summary
Section 55-4.01A includes specifications for fabrication and erection of station structural steel framing members that includes station stair framing, station elevator framing, shelter, VMS support framing, railings, roof framing, base plates, anchors and other miscellaneous station structural steel elements designed per Chapter 22 or the CBC 2013, AISC 360 “Specification for Structural Steel Buildings,” and AISC 303 “Code of Standard Practice for Steel Buildings and Bridges” (Latest editions).
Station Steel Tower Stairs
Section 55-4 Station Structural Steel
55-4.01 Structural Steel Framing
55-4.01A (1) Summary
Section 55-4.01A includes specifications for fabrication and erection of station structural steel framing members that includes station stair framing, base plates, anchors and other miscellaneous station structural steel stair elements designed per Chapter 22 or the CBC 2013, AISC 360 “Specification for Structural Steel Buildings,” and AISC 303 “Code of Standard Practice for Steel Buildings and Bridges” (Latest editions).
FIELD MEET
Lightweight Cellular Concrete Fill
Tecolote Road Underpass at Tecolote Creek
PPE Required
Thursday, December 15, 2015 at 10 a.m.
EMDT Bridge Removal
3628 Morena Blvd.
San Diego CA 92117
Thursday, December 3, 2015 at 12 p.m.
EMDT Bridge Removal
3628 Morena Blvd.
San Diego CA 92117
Thursday, November 19, 2015 at 2 p.m.
Required Field MEET
EMDT & MID-COAST SEGMENT 1 & 2 CIDH FOUNDATIONS
3628 Morena Drive
San Diego CA 92117
PPE Required
Monday, October 12, 2015 @ 9:00 a.m.
MID-COAST SEGMENT 3 & 4 CIDH FOUNDATIONS
7438 Charmant Drive
San Diego CA 92122
PPE Required
Monday, October 12, 2015 @ 9:00 a.m.
CONTRACTOR OUTREACH OPEN HOUSE
Wednesday, September 2, 2015
- 9/2 Outreach Flyer
- 9/2 Outreach Presentation
- 9/2 Outreach Photo Layout
- 9/2 Outreach Registration List
Thursday, May 28, 2015
- Contractor Open House May 25th
- Outreach May 25th PPT Presentation
- Outreach Photo Layout
- Outreach Registration List
Thursday, February 19, 2015
- Contractor Open House
- Outreach PPT Presentation
- Outreach Event Poster Boards/Project Renderings
- Outreach Event Sign-In Sheet
- Outreach Event Summary
- Event Photos
NON-MANDATORY PRE-PROPOSAL MEETING
LRT Systems - Preconstruction Services
Monday, March 30, 2015 at 1 p.m.
*Due Date: Thursday, April 30, 2015 at 4 p.m.
- LRT System PPT Presentation (MCTC)
- LRT System PPT Presentation (PB)
- LRT System Pre-Proposal Sign-In Sheet
PRE-PROPOSAL MEETING
LOSSAN Railroad Signaling - Preconstruction Services
- LOSSAN RR Signaling RFP Advertisement
- LOSSAN RR Signaling PPT Presentation
- LOSSAN RR Signaling Pre-Proposal Sign-In Sheet
Past PROPOSALs
May 2018
SANDAG and MCTC are finalizing the requirements of the parking structure at the La Jolla Village Square Plaza along Nobel Drive for the Mid-Coast LRT Extension. The parking structure will be procured by MCTC as a Design Build package. Bridging documents for the procurement are being prepared, and an RFP is expected within 90 days. Parking structure highlights include:
- Capacity of ~500 spaces;
- 4 levels;
- 10-20 electric vehicle charging station;
- Photo-voltaic system (sized to accommodate at least 75% of the estimated structure electrical usage);
- Vehicle counting system;
- Bicycle parking facility (similar to the one used at the Wells Fargo Building at 401 B Street); and
- CCTV
Preliminary site plan showing a draft footprint, layout, and vehicular circulation is included in downloads. Prior to issuing an RFP, MCTC is seeking industry review and is inviting potential design-build entities to become part of the MCTC project team. Please contact us for an appointment.
SANDAG CMGC 1 Mid-Coast Project(s)
Station Elevators
*CHANGED-Due Date: Friday, March 18, 2016 at 2 p.m. / Friday, April 8, 2016 at 2 p.m.
To: Friday, April 29, 2016 at 2 p.m.